Welcome to our Bathrooms page.

We have succesfully installed everything from new & replacement electric showers to complete bathrooms with everything in between. Homecall are registered as a better bathroom company for your peace of mind and protection.

A full installation of a replacement bathroom can take up to 2 weeks, which includes removing old tiles, replastering, rerouting new pipework and wastes, installing the new bathroom, tiling, and finishing touches.

If you only have one toilet in your home, service can be maintained throughout the installation with the use of flexible connectors, so you are not without at least a WC and sink.

Below are a few examples of a complete bathroom installation.

Remove old bath suite and replace with new shower suite, tiles and old loose plaster gone.

     

    

    

Old bathroom out and new shower suite installed, fully tiled.

      

  

Another complete installation with P shape showerbath and tiling.